Dualization of Al Kharijia Street
1003
Oman
Muscat Municipality
The main scope of work includes 3.5 Km Dualization of Al-Kharijiya Street from existing Al-Khuwair ROP signal up to newly constructed signalized intersection at Ministry of Foreign Affair, with 3 No's Signalized Junctions including 1.5 km of service roads, construction of 2 No Bridge's (New Sarooj Bridge across Sultan Qaboos Road & Wadi Bridge at Al Masa Mall Signalized junction), construction of reinforced concrete structures like storm water drainage open & closed channel connected through a network of HDPE pipes, construction of retaining wall, concrete/riprap protection, sidewalks etc. Relocation of existing utilities such as Water pipeline, Telephone lines, Electrical cables & Irrigation pipeline. The ancillary works included Landscaping, Decorative Street Lighting and all other road furniture items.
Design Review and Construction Supervision which include the following:
1) Assist the Employer in Contract Administration and in Contract Management
2) Provide guidance and direction to the Contractor
3) Furnish all necessary ground and topographic data, including setting out of control points
4) Issue the interim payment certificate based on the progress at site and according to the conditions of the contract
5) Review and recommend for approval revision (if any) of Contractor's work schedule
6) Establish standardized Quantity and Quality control programs (Quality Plan)
7) Establish Safety plan
8) Review and approve Contractor's working drawings and temporary works proposals
9) Provide supervision of works to ensure Contractor's compliance with the specs and contractual obligations
10) Notify the Employer about Contractor's claims and provide the Client with the evaluation
11) Prepare variation orders, evaluate request of time extension
12) Keep the Client informed about progress and problems or potential problems
13) Coordination with Local Authorities and Third Parties involved in the works
Roads & Bridge
Supervision
1-Jan-10
Completed