• Bait Al Barka Road Drainage

     

  • Project Number:

    514

     

  • Project Country:

     Oman

     

  • Client Name:

     Diwan of Royal Court Affairs

     

  • Narrative Description of the Project:

    The project site is located in the Muscat Region about 40 km away from capital Muscat. The Bait Al Barkah has a great value and importance. Due to the progressive and excessive development in the area, the drainage system has totally changed. The individual and isolated drainage systems commonly generates change of flow pattern and scheme. As a result some areas may be flooded and/or experienced water stagnation. The best solution is to follow integrated hydrological approach by studying the entire area and all contributing catchments, wadis, crossings.

     

  • Description:

    1) Topographical survey of the entire road network along with the existing drainage system and adjacent ground levels
    2) Carrying out the Feasibility Study
    3) Coordination with the Client and Concerned authorities
    4) Study of the existing drainage system
    5) Carrying out the Hydrology and Hydrological Study
    6) Preliminary and Final Design including detail design report and detailed drawings
    7) Carrying out the Cost Estimate and preparation of Tender Documents
    8) Technical advise during construction stage and construction supervision
    9) Full and partial construction supervision

     

  • Project Sector:

    Drainage

     

  • Services:

    Preliminary Design
    Final Design-Design Review

    Supervision

     

  • Project Start Date:

    13-Jun-05

     

  • Project Status:

    Completed

     

  •  

Project Country
Project Sector
SERVICES
Project Status